JOB COSTING WITHOUT THE OFFICE WORK

Know what the job is costing while you can still do something about it.

The dangerous number is not the final bill. It is the pile of material runs, returns, small tools, fuel, and extra work that never made it back to the job.

The real problem starts between the store and the truck

You buy supplies for two jobs, put the receipt in the console, and plan to sort it out Friday. Friday becomes next week. The card statement shows the store and total, but not which fittings went to which address. Now the job total is a guess.

CostNota is built for that moment. Record the purchase while the job is still obvious, review the receipt line items, and attach the cost to the right project.

What you can track

What CostNota does not try to replace

It is not payroll, dispatch, full bookkeeping, or an all-in-one contractor ERP. It gives a solo contractor or small crew a faster field record, then lets you export information when it needs to go elsewhere.

A practical daily routine

  1. Create the job before the first supply run.
  2. Scan or enter each purchase before leaving the parking lot.
  3. Review the detected items and job assignments.
  4. Record refunds against the same job.
  5. Check the job pulse before promising more work or buying more material.